“New bathroom fitted. George and the team did a great job. Would definitely recommend GWS.”
New Bathroom Installation in Kent & South East London
GWS installs new bathrooms end-to-end — strip-out, plumbing, electrics, tiling, suite, brassware, finishing — across Dartford, Bexleyheath, Sidcup, Bromley and the wider Kent / SE London area. One team, one invoice, 10–14 working days for most jobs. Below: how the install actually runs, day by day.
How a GWS bathroom install runs
No mystery — here's exactly what happens, day by day, on a typical mid-range install. Every step is planned during George's free home visit so there are no surprises once we start.
- 1Day 0
Free home visit
George visits, measures up, talks through the spec and confirms what's possible. No charge, no pressure.
- 2Days 1–5
Quote & confirm
Written fixed-price quote within 5 working days of the visit. £100 holding deposit secures your start date.
- 3Day 1 of work
Strip-out
Old suite removed, waste taken away, walls and floor prepared. Dust sheets and floor protection through the route to the bathroom.
- 4Days 2–5
First fix
Plumbing and electrical first-fix: pipes, drainage, cabling, ventilation. Walls boarded and ready for tiling.
- 5Days 5–10
Tiling & second fix
Wall and floor tiling, suite installed (bath, shower, WC, basin), brassware fitted, electrics commissioned.
- 6Days 10–14
Finishing & handover
Silicone, decorating made-good, final clean. Walk-through with you to sign off — punch-list anything you spot.
What a turn-key install includes
All managed by GWS on one invoice. No subcontractors hiding behind your name. VAT itemised separately.
Useful next steps
- Use the budget calculator — 2-minute online tool that gives you a typical-range figure within ±15 % of our formal quote.
- See real renovation prices — actual cost bands from jobs we've quoted in Kent in the last 18 months.
- Browse case studies — before/after photos and full breakdowns of recent installs.
- How GWS works — process, payment structure, what to expect from the home visit.
New bathroom installation — questions answered
How long does a new bathroom installation take?
Most full installations run 10–14 working days from strip-out to handover. A simpler refresh (suite swap, basic re-tile) can land in 6–9 days; a premium install with layout changes, large-format porcelain, and underfloor heating can run 14–22 days. We don't take on more than one bathroom at a time, so you have one team focused on your job from start to finish.
Do I need to be home while you work?
Not all day, no. We'll usually need access at the start of the day (around 8:00–8:30) and a way to lock up at the end (around 17:00). Most customers leave a key or a key safe; some prefer to be home for the noisy days (strip-out, tiling). We're happy with whatever works for you — what we ask is consistent access so we don't lose half a day waiting.
Can I still use a bathroom while you work?
If it's your only bathroom, we'll plan the schedule so you have a working WC and basin overnight from day 1 — usually by leaving the existing WC connected until late on day 1, then making the new one live before we leave that evening. The shower or bath will be out of action for ~7–10 days; many customers use a friend's, gym's, or temporarily fit a portable shower in another room. Talk to George about it during the home visit and we'll plan around your situation.
What's included in a new bathroom installation?
GWS turn-key installs include: strip-out and waste removal, all plumbing and electrical work (with notification through Building Regulations where required), the suite (bath, shower, WC, basin), wall and floor tiling labour and materials, flooring, brassware, mirror, towel rail, and full reinstatement (silicone, decorating made-good, final clean). VAT is itemised separately. We do not subcontract — every trade is managed by GWS on one invoice with one warranty.
Do you supply the suite or do I?
Either works. Most customers prefer us to supply — we get trade pricing on suites, brassware and tiles that's typically 15–25 % below retail, and any returns or shortages are our problem to fix, not yours. If you've already bought a suite or want to source specific high-end pieces, we'll fit your supply happily — we just ask you have everything on site by day 0 and confirm dimensions match the room.
Where do you install bathrooms?
Our home patch is Dartford and the surrounding Kent / South East London corridor: Bexleyheath, Sidcup, Bromley, Orpington, Gravesend, Greenhithe, Swanscombe, Crayford, Erith, Welling, Eltham, Greenwich, Blackheath, Lewisham, Catford, Woolwich. We're 25–40 minutes from any of those. Further afield by arrangement — call George.
What our customers say
Ready to book a free home visit?
Tell us about your bathroom — size, what you have in mind, any photos you'd like us to see. George will be in touch within 24 hours to arrange a visit at a time that suits you.